97% multi-unit
96.8% of Sunny Isles Beach's housing units are in buildings with two or more units (ACS 2020-2024).
Source: Census ACS 2020-2024: Sunny Isles Beach units in structureNearly 97% of Sunny Isles Beach homes are in multi-unit buildings, most of them towers. We install Miami-Dade NOA impact balcony sliders with the engineered wind pressures and board letter the city requires.
Sunny Isles Beach is a city of condo towers. 96.8% of its homes are in multi-unit buildings, and most of the old Collins Avenue motels were torn down in the 1990s for new construction. Balcony sliders there face strong wind off the water, and higher floors see higher pressure. For beachfront properties on the coastal control line, we check for added state requirements.
The city's permit asks for engineered wind pressures for each opening and a notarized letter from your condo board naming us. It also limits what contractors can charge for permits.
96.8% of Sunny Isles Beach's housing units are in buildings with two or more units (ACS 2020-2024).
Source: Census ACS 2020-2024: Sunny Isles Beach units in structureWindow and door permits require two copies of the Miami-Dade product approval and two signed and sealed site-specific wind pressure calculations by a structural engineer or registered architect.
Source: City of Sunny Isles Beach: Permit Application and Fee SheetFor condo work, the city requires a signed, notarized letter from an active association board member acknowledging the work and naming the approved company.
Source: City of Sunny Isles Beach: Permit Application and Fee SheetA recorded Notice of Commencement is needed for improvements of $5,000 or more, and owner-builder permits are not allowed in multi-family or commercial buildings.
Source: City of Sunny Isles Beach: Permit Application and Fee SheetCity code Section 138-3 requires contractors to disclose permit fees on initial and final invoices and not charge more than the city's actual permit cost, with a $500 penalty per violation.
Source: City of Sunny Isles Beach: Permit Application and Fee SheetLocal details verified October 2026. Rules change; we confirm current code and permit requirements on every quote.
Impact sliding glass doors depend on panel count, width, and the wind rating your building needs, so we price them after a free measurement. City of Sunny Isles Beach permit fees are separate.
Impact window cost guide Financing options Finished projects Sliding Glass Doors: products and options
How it works
Floors and furniture covered, and the work area sealed off.
Old units pulled and openings prepped clean.
New impact units set plumb, anchored, and sealed.
County inspection scheduled, then paperwork handed to you.
“David did an excellent job removing a large glass block window in our bathroom and replacing it with a top quality hurricane window.”
FAQ
Straight answers on permits, ratings, and timing for your city.
Call (954) 884-8224A signed, notarized letter from an active board member acknowledging the work and naming the approved company. We send a ready-to-sign draft.
Not in a condo tower. Sunny Isles Beach does not allow owner-builder permits in multi-family or commercial buildings.
It depends on width, panel count, and the wind rating for your floor. We quote for free after measuring. Permit fees are separate and shown at the city's actual cost.
Free measurement. Board letter, engineering, and the city permit handled.
Tell us about your project and David's team will follow up, usually the same week, with honest pricing and a permit plan.
(954) 884-8224